Services

Construction websites built around your project record

A construction website should prove you have built this kind of thing before. We build sites around detailed project pages, with clear paths for owners, procurement teams and homeowners.

Written by Ali Sedighi, MBALast updated:

A construction website has one job: to make the next step feel safe. For an owner's representative, that means seeing proof you have delivered similar scope at similar value. For a homeowner, it means seeing finished work, a clear process and a sense of how you communicate. We build sites around detailed project pages because a project record persuades both readers better than any slogan.

What a construction website is for

It is a verification tool first and a lead generator second. Most serious enquiries reach your site after a referral, a tender notice or a drive past one of your job signs.

That shapes the priorities:

  • Answer "have they done this before?" within ten seconds, with project types and sizes on the home page.
  • Make capacity visible. Typical project value range, regions served, delivery methods (design-build, CM, stipulated sum), and in-house trades if you self-perform.
  • Make contact easy for both buyers. Phone, text and email on every page, with separate wording for owners and homeowners.

Who it's for

  • Commercial and institutional GCs that are prequalified by public owners, school boards or health authorities, and need a site that matches their prequalification documents.
  • Custom home builders and renovators whose buyers compare three or four firms before calling any of them.
  • Developers who need a credible company site behind each project launch, so land partners, lenders and buyers see the same story.
  • Design-build firms that sell process as much as product.

What's included

  1. Project page system. Each page covers the project type, region, size (square feet or units), contract value range if you allow it, schedule, delivery method, your role, notable challenges and photos. Owner names only with permission.
  2. Capability pages for each sector you want: multi-family, industrial, tenant improvements, institutional, custom homes, additions, heritage renovation.
  3. A procurement-friendly "Company" section: safety programme overview, certifications you actually hold, bonding and insurance statement wording that you supply, and downloadable company profile.
  4. Homeowner process pages: how a project runs from first call to handover, with realistic timelines and what drives cost.
  5. Contact paths built on call, text and email, with tracking numbers so we can see which pages produce enquiries.
  6. Technical basics: fast loading on a phone at a job site, clean structure for search engines, and accessibility checks.

Timeline

Week Work
1 Discovery call, project list, photo and data collection begins
2–3 Structure, project page drafts, capability copy
4–6 Design, build, your review of every project page
6–8 Corrections, launch, tracking checked end to end

Larger firms with dozens of projects may take longer, mostly because photo rights and owner approvals take time.

How results are measured

We don't judge a construction site by traffic alone. We track:

  • calls, texts and emails by page and by source
  • visits to project pages from people who later make contact
  • enquiries by type: owner, homeowner, subcontractor or job seeker (the last two filtered out of sales reports)
  • for homeowner work, the share of enquiries that book a site visit

Pair the site with SEO for builders if you want it to attract new visitors, or with the B2B pipeline service if most of your work comes through owner relationships.

Mistakes to avoid

  • A gallery with no words. Photos without scope, size or role tell an owner almost nothing.
  • Claiming work you subcontracted as self-performed. Owners check, and it costs you credibility on the next bid.
  • Listing regulated trade scope you don't hold a licence for. In some provinces, advertising certain work can itself require a licence. Our region pages link the relevant bodies; confirm with them before you list a scope.
  • One message for every reader. A homeowner doesn't care about your EMR; a facilities manager doesn't care about your kitchen finishes.
  • Stale projects. If your newest project page is from 2019, buyers assume you have slowed down.

Website pricing is linked from our pricing page. On some Trades.Agency plans, website design is discounted or included, so ask about it before you budget separately.

Frequently asked questions

How many project pages do we need?

Start with eight to twelve that represent the work you want more of, not everything you have ever built. A strong page on a recent mid-rise or a $900,000 custom home beats thirty thin gallery entries.

We can't share some client names. Can we still show the project?

Yes. Many owners restrict publicity. We describe the project type, size, location by region, delivery method and schedule without naming the owner, and we always check your contract terms before publishing anything.

Who owns the website?

You do. The domain, content, photos and hosting account stay in your company's name. If you leave, you keep everything.

How long does a construction website take?

Most builds take four to eight weeks. The real constraint is usually gathering project photos, sizes and dates from your team, so we start that collection in week one.